Lead Recycling
Posted: Fri Oct 22, 2021 12:45 pm
Hi Pawer people of Vicidial...
Can somebody here elaborate the use of lead recycling method.
The ATTEMPT DELAY field is the number of seconds until the lead can be placed back in the hopper, this number must be at least 120 seconds.
The ATTEMPT MAXIMUM field is the maximum number of times that a lead of this status can be attempted before the list needs to be reset, this number can be from 1 to 10.
Do i have specifically reset the Lead List(s), incases we ran out of leads or the dialer does it at a random time manner by itself.
Thanks.
Can somebody here elaborate the use of lead recycling method.
The ATTEMPT DELAY field is the number of seconds until the lead can be placed back in the hopper, this number must be at least 120 seconds.
The ATTEMPT MAXIMUM field is the maximum number of times that a lead of this status can be attempted before the list needs to be reset, this number can be from 1 to 10.
Do i have specifically reset the Lead List(s), incases we ran out of leads or the dialer does it at a random time manner by itself.
Thanks.