Vicibox Cluster

Any and all non-support discussions

Moderators: gerski, enjay, williamconley, Op3r, Staydog, gardo, mflorell, MJCoate, mcargile, Kumba, Michael_N

Vicibox Cluster

Postby prosenjit2009 » Fri Jan 18, 2019 8:07 am

Server type- Dell C6100
24(DB)/12(web) GB RAM
16 Core CPU
CPU TYPE-XEON 3.0
VERSION: 2.14-669a
BUILD: 180411-1647
SVN version :2964
DB Schema Version:1541
ASTERISK VERSION-13.21.1-vici
INSTALLER VERSION-8.0
SSD HDD
No PRI/SANGOMA
No Extra Software or hardware


Hello,

I am planning to setup a vicibox cluster. I have almost 90 agents over 4 different campaign with ratio dialing though ILL. I have 4 node server ( Dell C6100) with adequate RAM. Can any one suggest me how many asterisk server and how many web server will be required ? any combined server like DB+web and asterisk are enough ? kindly suggest for best performance.

Regards
Prosenjit
prosenjit2009
 
Posts: 38
Joined: Fri Dec 22, 2017 6:12 am

Re: Vicibox Cluster

Postby williamconley » Fri Jan 18, 2019 3:43 pm

The Vicidial Manager's Manual has scaling suggestions as a preface. Agent count is interesting, but system capacity is "live-call" based. 90 agents could have 80 live calls (manual or 1:1 dialing) or 9000 live calls (robodialing with a press 1 campaign) or anywhere in between. Thus your best bet is to start with the recommended "25 agents per server" and then scale up as needed, based on the server roles suggested in the Manual. Server capacity really is personal. Every call center has their own patterns of usage and configuration options which have a huge (personalized) effect on server/cluster capacity.
Vicidial Installation and Repair, plus Hosting and Colocation
Newest Product: Vicidial Agent Only Beep - Beta
http://www.PoundTeam.com # 352-269-0000 # +44(203) 769-2294
williamconley
 
Posts: 20258
Joined: Wed Oct 31, 2007 4:17 pm
Location: Davenport, FL (By Disney!)


Return to General Discussion

Who is online

Users browsing this forum: No registered users and 111 guests